Day 1: Implementing VLAN solutions

  • VLAN solutions with different network environments.
  • Creating VLAN implementation plans.
  • Creating VLAN verification plans.
  • Configuring switch-to-switch connectivity.
  • VLAN loop prevention.
  • Access Ports configurations.
  • Verification of VLAN solutions using show and debug.
  • Documenting the verification after implementing a VLAN solution.

Day 2: Implementing a Security Extension of a Layer 2 Solution

  • Network resources needed for implementing a security solution.
  • Implementation plans for the security solution.
  • Verification plans for the security solution.
  • Configuring port security.
  • Configuring general switch security features.
  • Private VLANs, VACL and PACL.
  • Verifying security based solutions using show and debug.
  • Documenting the verification after implementing a security solution.

Day 3: Implementing Switch-Based Layer 3 Services

  • Network resources needed for implementing a switch-based Layer 3 solution.
  • Implementation plans for the Layer 3 solution.
  • Verification plans for the Layer 3 solution.
  • Configuring routing interfaces.
  • Configuring Layer 3 security.
  • Verifying Layer 3 solutions using show and debug.
  • Documenting the verification.

Day 4: Advanced Services Infrastructure

  • Implementing a Wireless Extension of a Layer 2 solution.
  • Implementing a VoIP support solution.
  • Implementing video support solution.

Day 5: High Availability

  • Identifying network resources needed for High Availability.
  • High Availability implementation plans.
  • Creating High Availability verification plans.
  • Implementing first-hop redundancy protocols.
  • Implementing switch supervisor redundancy.
  • Verification with show and debug commands.
  • Documenting the implementation and verification of High Availability.