Course: SWITCH section 2
November 3, 2013 | By Boyd |
Course Outline
Day 1: Implementing VLAN solutions
- VLAN solutions with different network environments.
- Creating VLAN implementation plans.
- Creating VLAN verification plans.
- Configuring switch-to-switch connectivity.
- VLAN loop prevention.
- Access Ports configurations.
- Verification of VLAN solutions using show and debug.
- Documenting the verification after implementing a VLAN solution.
Day 2: Implementing a Security Extension of a Layer 2 Solution
- Network resources needed for implementing a security solution.
- Implementation plans for the security solution.
- Verification plans for the security solution.
- Configuring port security.
- Configuring general switch security features.
- Private VLANs, VACL and PACL.
- Verifying security based solutions using show and debug.
- Documenting the verification after implementing a security solution.
Day 3: Implementing Switch-Based Layer 3 Services
- Network resources needed for implementing a switch-based Layer 3 solution.
- Implementation plans for the Layer 3 solution.
- Verification plans for the Layer 3 solution.
- Configuring routing interfaces.
- Configuring Layer 3 security.
- Verifying Layer 3 solutions using show and debug.
- Documenting the verification.
Day 4: Advanced Services Infrastructure
- Implementing a Wireless Extension of a Layer 2 solution.
- Implementing a VoIP support solution.
- Implementing video support solution.
Day 5: High Availability
- Identifying network resources needed for High Availability.
- High Availability implementation plans.
- Creating High Availability verification plans.
- Implementing first-hop redundancy protocols.
- Implementing switch supervisor redundancy.
- Verification with show and debug commands.
- Documenting the implementation and verification of High Availability.